A 60 ton truck transports the 800 equipment to the facility.
(The unloading of equipment occurred at night)
A Bruker engineer opens the box, which contains the magnet.
A crane lifts the magnet from the truck.
The magnet is on the skating platform. The Bruker engineer is fixing an air skate.
The magnet is skating with three air skates underneath.
The magnet is very large. One person cannot completely hug it.
Mini-jacks are used to lift the magnet.
Workers are constructing a platform around the magnet.
What a solid and decent platform it is!
The huge and ultra-stabilized Bruker magnet. The decay of magnetic field strength is only around 2-3 Hz per hour.
From left to right: Pump's box, Pump's Control Unit, UPS, Console, and Computer.
The whole Bruker Avance 800 NMR Spectrometer.
The Manager is operating the spectrometer.